Imperial County OWTS Process
Imperial County septic & OWTS planning
Start with Imperial County Environmental Health. Confirm the path for the property before commissioning testing or design.
Choose a county guideConfirm the property can use septic.
Ask the County about sewer availability and the proposed use or change. The County application excludes properties with available community sewer service. Confirm eligibility for the actual parcel rather than assuming septic is an option.
Establish site-specific evidence.
The County packet calls for percolation testing at the proposed disposal-field location by a qualified professional. Coordinate the testing approach with Environmental Health; results from another property do not establish this site's suitability.
Prepare the applicable design package.
Gather the permit application, soil report, site and floor plans, system specifications and field profile identified in the County packet. Engineering requirements depend on the project: non-residential systems and wastewater holding tanks require a California-licensed engineer, and groundwater or soil conditions can also trigger engineering for residential sites.
Work through review and inspections.
Environmental Health reviews OWTS designs and inspects construction. Confirm the current submittal requirements, respond to review comments and coordinate construction inspections with the County. This guide does not establish parcel-specific approval.
Use current Imperial County resources.
- Environmental Health Land Use program
- Current County forms and guidelines
- County septic information packet (PDF, dated September 2023)
- Current Environmental Health fees
County Environmental Health: 442-265-1888 ยท [email protected].
Official sources checked 21 October 2026. Confirm current requirements directly with the County; this summary is a planning starting point.
Start with the property.
Share the location, proposed use and available records so we can discuss an appropriate engineering scope.
Start a project Septic & OWTS planning