Percolation testing & septic planning
Establish the site evidence needed for an onsite wastewater design.

Concept illustration, not a project or staff photograph.
Check the available records first
Existing soil, septic and percolation information may help establish the testing path. Whether those records are sufficient is a project-specific agency decision; nearby test results do not automatically establish your property’s capacity.
Plan field work before scheduling
New work may require a testing permit, excavation, water, safe access and inspection coordination. The written scope identifies responsibilities for preparation, testing, restoration and costs. Do not assume a soil test alone determines final system approval.
Connect testing to the whole site
Building use, proposed bedroom count, grading, wells, setbacks and reserve area all influence wastewater planning. Accepted site evidence informs the system options and the design documentation.
Choose the right County process
San Diego, Riverside and Imperial Counties have separate procedures and professional requirements. Start with the guide for your jurisdiction and confirm the current path for the actual property.
San Diego County OWTS guide · Riverside County OWTS guide · Imperial County OWTS guide
Start with your site.
Tell us the location, your goal and the questions you need to resolve. We’ll define the proposed work in writing before an engagement begins.