Quenched Earth.Start a project

SAN DIEGO COUNTY · OWTS WORKFLOW

Plan your septic system
with the whole property in mind.

A clear path from your first questions to a coordinated onsite wastewater treatment system (OWTS) layout and County review.

Guide and fee schedule reviewed October 8, 2026

illustration of a San Diego hillside property with a home, native planting and open land for coordinated site planning.

illustration of a San Diego hillside property with a home, native planting and open land for coordinated site planning.

Our standard service includes preparing and submitting the layout and design report, coordinating the septic design and responding to ordinary County plan-check comments through approval. Additional work is identified before you authorize it; approval remains the County’s decision.

FROM FIRST QUESTIONS TO INSTALLATION

OWTS Workflow

The eight stages below match the detailed project steps. Expand a stage’s notes for applicable costs, timing and scope. Testing and installation follow their own requirements; the timing below is a planning allowance, not a guaranteed finish date.

County fees and planning allowances were checked 8 October 2026. See the scope and fee details below for the applicable categories, effective schedule and exclusions.

Read all eight steps and notes
  1. STEP 01

    Property & plans

    Share the property location, proposed building plans and available septic records.

    Read step 01 details
  2. STEP 02

    Scope & agreement

    Share your goals and records. Confirm the proposal, signed agreement and required retainer.

    Applicable costs, timing & scope

    Professional fee
    Quoted for your project

    Read step 02 details
  3. STEP 03

    Site coordination

    Coordinate the site and floor plans, property constraints, access and the property visit.

    Read step 03 details
  4. STEP 04

    Soils & testing

    Review existing evidence. If new testing is needed, confirm the permit, field arrangements and written scope.

    Applicable costs, timing & scope

    County testing review, if needed
    $792Field-work costs are separate. Testing can extend preparation.

    Read step 04 details
  5. STEP 05

    Capacity & design

    Confirm capacity and prepare the coordinated layout and design basis for the proposed use.

    Read step 05 details
  6. STEP 06

    County submission

    Submit the coordinated OWTS layout, design report and supporting records to the County.

    Applicable costs, timing & scope

    About 3–4 weeks to first submittal after the signed agreement, retainer and needed plans and information are received.

    County layout review
    $1,966 new construction$1,737 for additions/pools; category depends on the project.

    Read step 06 details
  7. STEP 07

    Review & revisions

    Applicable costs, timing & scope

    About 6 weeks for current review. Ordinary plan-check responses through approval are part of our standard service.

    Comments and decisions
    Approval remains with the CountyMissing information or further review can extend the schedule.

    Read step 07 details
  8. STEP 08

    Installation planning

    Use the approved layout to plan the installation. Select an installer and confirm permits, inspections and responsibilities.

    Layout approval is not installation. Construction permits, construction and inspections remain a separate phase.

    Applicable costs, timing & scope

    Contractor and construction support
    Separately scopedAn approved layout is not a completed installation.

    Construction and required inspections follow the installer’s schedule and the applicable permits.

    County installation permit
    $1,085 standard OWTS$1,870 treated OWTS. Repair and operating categories are listed below. Construction costs are separate.

    Read step 08 detailsAll fee categories

01 Start with the place

Share your property and building plans

Tell us what you want to build or change. Share the property address and APN, the existing and proposed homes, the bedrooms in each unit, and any future expansion to consider. Include your architect, building designer or builder so we can coordinate early.

Your part

Send the basic property information and whatever plans or septic records you have. If you are buying the property, tell us your due-diligence deadline and the decision you need to make.

Coordination and scope details

We identify whether you need a preliminary feasibility review or a full OWTS design scope.

Illustrative property maps, house plans and organized records for an initial project discussion.

02 Agree the work

Confirm the scope and get started

Your project-specific proposal describes the work, deliverables, professional fee, payment milestones and optional services. Once the agreement is signed and the required retainer is received, we schedule the agreed work.

Your part

Confirm the owner and authorized signer, review the scope, sign the agreement and pay the initial invoice. County charges and installation costs are separate from our professional fee.

People discussing a project scope around a planning table.

People discussing a project scope around a planning table.

03 Bring the plans together

Coordinate the site plan and visit the property

We review current site and floor plans alongside boundaries, easements, topography, access and known utilities. Building placement, the driveway, grading and future improvements all affect the space for the septic system and its reserve dispersal area.

Your part

Provide the current title report, available surveys and plans, and safe site access. Tell us about wells, pools, retaining walls, graywater systems and other planned improvements before the layout is finalized.

Coordination and scope details

Your building designer develops the building plans; we coordinate the OWTS layout with them. The project scope confirms who supplies missing base mapping or any licensed field survey.

Professionals assessing a sloped property and considering the building location and terrain.

Professionals assessing a sloped property and considering the building location and terrain.

04 Use accepted site evidence

Establish the soils and testing path

We review septic, soil and percolation records to determine whether they can support the proposed design. Historical or nearby records may support a request to avoid new testing; County acceptance must be established for your project.

Your part

If new testing is needed, review and authorize its scope in writing. The project-specific scope confirms responsibility for permit preparation, excavation, water, site preparation and restoration, scheduling, and the related costs.

Testing arrangements and next step

New testing requires its own County permit and fee before field work. Access, site preparation and County inspection availability affect scheduling. Accepted evidence and testing results then inform system options and feasible bedroom capacity.

County testing application (PDF)
Illustrative soil samples and field tools representing the site evidence used to choose a testing path.

05 Fit the system to the site

Confirm capacity and prepare the design

We evaluate the system against the proposed building program and site constraints. The layout identifies the tank, dispersal system, setbacks, reserve area and required components. The report explains the design basis and supporting information.

Your part

Confirm the selected feasible bedroom and dwelling-unit count, review the layout and provide one coordinated set of comments. Make sure your architect or builder is using the same plan version.

Coordination and scope details

Exploring a larger system does not automatically include several complete designs. Alternate designs, changed building placement or a later increase in bedrooms may require additional work.

Conceptual site model showing a home, access and open planning zones; these are not engineered system locations.

Conceptual site model showing a home, access and open planning zones; these are not engineered system locations.

06 Prepare a coordinated package

Submit the layout and design report

After internal review, we submit the OWTS layout and design report to San Diego County DEHQ. The submission must match the building and site information and include the applicable supporting records.

Your part

Sign required owner documents, provide remaining information and pay the applicable County layout-review charge. We explain what is needed to keep the review moving.

County residential layout report (PDF)
Illustrative layout sheets and report organized for submission and review.

07 Work through the comments

Respond to County review

Allow about six weeks for current County review. This is a planning estimate, not a guaranteed approval date. Our standard service includes responding to ordinary plan-check comments and making the associated revisions through approval.

Your part

Respond to requests for project decisions or missing information. If your project changes or a new condition requires work beyond the agreed scope, we explain the added work and fee before proceeding.

Coordination and scope details

Additional testing, missing information and further review can extend the schedule. Approval remains the County’s decision.

Reviewer comparing illustrative site layouts during a design review.

Reviewer comparing illustrative site layouts during a design review.

08 Move from approval to construction

Plan the installation

An approved layout is a key milestone. Installation still requires the applicable construction permit, an installer, construction and inspections. The installer’s price and schedule are separate from the design process.

Your part

Select the installer and confirm who obtains the installation permit, pays its fees and coordinates required inspections. Do not start construction from a preliminary design.

Coordination and scope details

Contractor bid support can be separately authorized after plan approval. Staking, construction-phase support, inspections and as-built services are included only when expressly stated in your agreement.

Project professionals discussing installation plans at a prepared site.

Project professionals discussing installation plans at a prepared site.

ONE PROJECT TEAM

Know who handles what.

You
Project decisions, owner records, site access and agreed agency payments.
Architect or building designer
Building and floor plans, coordinated with the civil design.
Quenched Earth
OWTS design coordination, submission and ordinary layout-review responses.
County and installer
The County reviews and permits; the installer prices and performs construction.
Quenched Earth.

SAN DIEGO COUNTY
OWNER PREPARATION

Your septic project checklist

Send what you have. Mark anything still being gathered with your architect or builder.

Owner / contact:

APN:

Property / project:

OWNER PREPARATION

Bring what you have.
Keep track of the rest.

Use this checklist with your architect or builder. You can begin the conversation while some records are still being gathered.

Download one-page PDF

The PDF is a blank checklist. Print the checked list to keep your check marks.

Illustrative folders, drawings and records for the owner preparation checklist.
To begin the conversation
Before site evaluation and design
Before the final layout is submitted

Why the title report matters: we request it during intake to identify recorded easements and related property constraints that may affect the layout.

SCOPE & FEE DETAILS

Know what is included.

Professional services, County charges and construction are separate costs. We quote our engineering work after reviewing the property and scope.

Illustrative groups of design documents, review records and construction materials representing separate cost categories.
All County fee categories and amounts

USD · FY 2026–27 approved schedule · effective July 11, 2026
Checked October 8, 2026. Not every fee applies to every project.

Selected County OWTS charges
County serviceFee
Percolation test and soil profile review$792
Layout report for new construction$1,966
Standard OWTS installation permit$1,085
Layout report for additions or pools$1,737
Layout report revision$1,196
Layout information review without field investigation$340
Standard OWTS repair installation permit$1,009
Standard OWTS reinspection$409
Treated OWTS installation permit$1,870
Treated OWTS annual operating permit$307

The layout-revision fee is a separate County category. It is not automatically charged for every ordinary correction during review. Confirm the applicable charges with the County before payment.

View the official County fee schedule

Standard design service

Preparation and submission of the OWTS layout and design report, septic-design coordination, and ordinary County plan-check responses through approval. Your proposal identifies the site evaluation, research, design basis and other deliverables for your property.

Work that may need a separate scope

New field testing; licensed survey or additional mapping; groundwater or geotechnical studies; advanced treatment; grading or drainage plans; alternate complete designs; owner-driven redesign; staking; contractor bid support; and construction-phase services.

We obtain written authorization for additional work. Agency fees and installation costs are paid separately.

COMMON QUESTIONS

A few things to clarify early.

Do I need every document before contacting you?

No. Start with your address or APN, the existing and proposed homes and bedrooms, your goal and the records you have. We help identify what is still needed.

Can old percolation records avoid new testing?

They may support that path, but acceptance must be established for the specific project. We review the available evidence and confirm the testing scope before you authorize new field work.

Does an approved layout mean installation is complete?

No. Installation still needs the applicable permit, contractor, construction and inspections. Construction-phase services are included only when your agreement expressly identifies them.

Does this guide also cover Riverside County?

See the separate Riverside County guide for its testing, professional-registration and submittal requirements.

Official County resources

This guide explains the process. Property conditions, the agreed scope and current County requirements determine the work needed for your project.

YOUR NEXT STEP

Start with the property.

An address or APN, your building plans and the questions you want to resolve.

Start a project

A Riverside County property?

The professional registration, testing and review path differs from San Diego.

Read the Riverside OWTS guide